Alimak LSH Series

Alimak LSH Construction Hoist

The In-Shaft Specialist: Close Your Building Envelope Faster.

Stop leaving your exterior facade open just to accommodate a traditional hoist. The Alimak LSH is engineered to operate entirely inside the building’s permanent elevator shaft, allowing your teams to finish the exterior cladding months ahead of schedule while moving personnel safely inside.

Rethink High-Rise Logistics

Traditionally, construction hoists are anchored to the outside of the building. This creates a massive logistical headache: you cannot fully seal the building envelope (installing windows and exterior panels) until the exterior hoist is finally dismantled at the very end of the project.

The Alimak LSH completely eliminates this bottleneck. By utilizing the empty elevator shafts during the construction phase, this specialized rack-and-pinion hoist provides high-capacity vertical transport internally. It doubles your logistical efficiency compared to traditional wire-rope “jump lifts” and protects your workers and materials from the unpredictable Caribbean weather.

High-rise in-shaft logistics

Engineered to Shorten Your Critical Path

1. Early Facade Closure

This is the ultimate financial advantage. Because the Alimak LSH runs inside the core of the building, your glazing and cladding contractors can seal the exterior facade continuously as the building rises. This allows interior finishing work (drywall, electrical, flooring) to begin much earlier in a climate-controlled environment.

2. Immune to Weather Delays

High winds and heavy rain frequently force exterior hoists to shut down for safety reasons, bringing your Caribbean job site to a standstill. Operating inside the concrete shaft, the LSH is 100% protected from the elements, ensuring uninterrupted vertical logistics 24/7.

3. Rack & Pinion Superiority (No Wire Ropes)

Unlike traditional traction “jump lifts” that require complex temporary machine rooms and vulnerable steel cables that stretch, the LSH uses Alimak’s proven rack and pinion drive. The motor travels with the car, making installation, operation, and mast extensions (“jumping”) significantly faster and safer.

4. Enhanced Site Safety

Operating within an enclosed shaft inherently reduces the risks associated with exterior high-altitude work. The LSH features precision floor leveling, robust door interlocks, and the standard Alimak overspeed safety device, providing a premium, secure ride for your crews.

Technical Specifications (Alimak LSH Range)

Bridge360 engineers will customize the LSH cabin to perfectly fit the dimensions of your building’s permanent elevator shafts.

  • Payload Capacity: Up to 2,000 kg (Handling large crews and heavy finishing materials)
  • Traveling Speed: Up to 60 m/min (High-efficiency cycle times)
  • Car Dimensions: Highly customizable to fit standard and custom elevator shafts.
  • Drive System: Internal rack and pinion (eliminating the need for traction cables).
  • Power Supply: Variable Frequency Control (VFC) for smooth, low-current operation.
  • Installation: Anchored directly to the shaft walls, keeping the core clear for parallel work.
In-shaft hoist technical planning

Complex Internal Logistics, Handled Locally

Installing a hoist inside a tight concrete shaft requires precision engineering and an expert installation team.

Partnering with Bridge360 guarantees:

Pre-Construction Planning

Our engineers work directly with your architects to ensure the shaft dimensions and tie-in points are perfectly prepped for the LSH system before the concrete is even poured.

Rapid Turnaround

Dispatched from our DR hub, the equipment arrives on schedule to match your concrete slip-form or jump-form timeline.

Seamless Transition

Once your building is ready for the permanent commercial elevators, our crews quickly dismantle and remove the LSH, leaving the shaft perfectly clear for the final installation.

Take the Weather Out of the Equation

Seal your building faster and keep your crews moving regardless of exterior conditions. Add the Alimak LSH to your construction strategy today.